Teaming/timing sequences in hotel development projects
Mehmet Nihat Hanioglu and
David Arditi
Construction Management and Economics, 2013, vol. 31, issue 4, 369-385
Abstract:
Branding secures easier financing, higher rates and occupancies and repeat business in the hospitality industry. Hotel operators use architectural and interior design elements to create uniquely differentiated products for their brands. Owing to the expected benefits, hotel owners often involve brand chain hotel operators in designing their properties. However, although they are heavily involved in the design, hotel operators leave it to the owner to deal with the construction of the property and with the challenge of accomplishing the design intent while completing the project on time and within budget. The teaming/timing sequences available for a prospective hotel owner are analysed. The consequences of the timing for adding the builder to the project team in different project delivery methods are identified. Also, the best practices relative to design coordination, constructability reviews, value engineering, mock-up room reviews, price confirmation, and project handover are considered. A custom software program ‘HotPlan’ is developed to assist owners in generating conflict-free sequences of teaming/timing options and evaluating the consequences of their preferences. Comparisons of the HotPlan-generated sequences allow users to pick the alternative that most agrees with their intentions. The study is relevant to other types of projects such as residential and office buildings, airports, and hospitals where the operator of the facility may participate in the development process right from the start.
Date: 2013
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2013.778417 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:31:y:2013:i:4:p:369-385
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2013.778417
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().