Developing a procurement path determination chart SEM-based approach
Mohammed A. Rajeh,
John E. Tookey and
James Olabode Bamidele Rotimi
Construction Management and Economics, 2015, vol. 33, issue 11-12, 921-941
Abstract:
The choice of an appropriate procurement system is crucial to construction project success. Procurement selection is largely based on path determination charts, with at least eight key criteria needing to be weighted by decision-makers. Including certain criteria whilst ignoring client-borne transaction costs (TCs) resulting from environmental uncertainties simplifies this process. TCs are ‘unseen’ costs associated with pre- and post-contract work. The effects of uncertainties in the transaction environment and procurement systems on TCs are investigated, comparing the traditional and design-build procurement systems. A cross-sectional sample approach was deployed, involving survey questionnaire and results verification through ‘real-world’ cases. Data was sought from construction professionals in management, design and operation of construction projects. The research participants evaluate their time spent on procurement activities using a five-point Likert scale. Hypotheses of the relations between environmental uncertainties, procurement systems, and pre- and post-contract TCs are tested using a structural equation modelling (SEM) approach. The study found that TCs account for about 46.75% and 42.88% of the daily time spent by project managers in traditional and design-build procurement systems in New Zealand respectively. The study concludes that the TC concept is a useful framework for determining objective instead of subjective opinions for procurement decisions.
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2016.1151538 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:33:y:2015:i:11-12:p:921-941
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2016.1151538
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().