EconPapers    
Economics at your fingertips  
 

Precedence relationship options for the resource levelling problem using a genetic algorithm

Vacharapoom Benjaoran, Wisitsak Tabyang and Nart Sooksil

Construction Management and Economics, 2015, vol. 33, issue 9, 711-723

Abstract: The resource levelling problem (RLP) arises in project scheduling where the intention is to reduce the fluctuation of the resource demand. The solutions of the RLP are achieved through the rearrangement of the project activities under a constraint of preselected precedence relationships. To relieve the constraint, a new concept of the RLP with relationship options is initiated. An activity of the project network can have one or more alternative types of relationship with other activities as appropriate. An alternative relationship provides more float time and allows new possibilities for the arrangement of efficient patterns of the project resource demand. The scheduling problem model was formulated by using mathematical equations on spreadsheet software and solved by using the genetic algorithm based optimization. The prototype was tested in two different project instances. The test results demonstrated that this new model could calculate and arrange the project schedules for all selected alternative types of relationships. The model with relationship options provided consistent results for efficient resource utilization schedules, which were better than the one without relationship options. These schedules could decrease the resource demand fluctuation and the maximum resource demand level. This new model of the RLP with relationship options not only provides the additional flexibility to level the resource demands but also determines suitable types of relationships for the project activities.

Date: 2015
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2015.1100317 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:33:y:2015:i:9:p:711-723

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446193.2015.1100317

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:33:y:2015:i:9:p:711-723