Innovative construction and the role of boundary objects: a Gehry case study
Liisa Naar,
Natalia Nikolova and
Perry Forsythe
Construction Management and Economics, 2016, vol. 34, issue 10, 688-699
Abstract:
Physical objects have long been used in addressing the challenges involved in constructing innovative buildings, yet their significance for collaborative problem solving in inter-organizational projects is rarely acknowledged. The aim of this research is to investigate what happens when a project team has to collaboratively innovate to address radical design challenges in a construction setting. We focus on the role of a full-scale mock-up of a façade in transforming the design intent for a building by Frank Gehry into design realization. The concept of boundary objects is used as an analytical lens via a case study methodology utilizing non-participant observation of weekly meetings and workshops over a period of 10 months covering client, consultant and contractor involvement. The research shows the role of mock-ups in radical construction settings is in tension along three delivery dimensions: performance, aesthetic and technical construction. Task completion competed with the requirements for experimentation around innovative problem solving with the how to construct it problem left unresolved. The findings suggest that co-location and synchronicity are critical conditions for collaborative and innovative problem solving in radical construction contexts. Project teams need to create open-ended ‘moments’ for iterating critical objects and the interactions that take place around them.
Date: 2016
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2016.1201206 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:34:y:2016:i:10:p:688-699
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2016.1201206
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().