Third-party logistics in construction: the case of a large hospital project
Andreas Ekeskär and
Martin Rudberg
Construction Management and Economics, 2016, vol. 34, issue 3, 174-191
Abstract:
The construction supply chain is of temporary nature and complex, with many interactions between multiple actors in different construction projects. This challenging context typically leads to relatively higher costs and lower productivity, compared to other industries. Supply chain management (SCM) has been put forward as a mean to better handle this challenging context. As a part of SCM initiatives some construction industry stakeholders have turned to third-party logistics (TPL) providers, especially in large construction projects. The use of TPL providers is a new, and under-investigated, phenomenon in the construction industry. The main purpose of this study is thus to explore the use of a TPL provider in a large construction project and to analyse its resulting effects. Driving forces and possible concerns for implementing TPL are identified and the possibility for TPL to be a facilitator for implementing SCM in construction is investigated. The research is based on a literature review and an explorative case study of a large hospital project in Sweden, where the client and the main contractor have initiated the use of a TPL provider to coordinate sourcing and materials handling activities on site. The results show positive effects on establishing an effective interface between the construction site and the supply chain. The results also show that a TPL solution facilitates an increase in productive work at the construction site itself, a reduction of costs and an increased utilisation of site assets. On the downside, the study also shows a lack of SCM knowledge amongst the involved actors in the project, hindering them to reap the full potential of TPL.
Date: 2016
References: View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2016.1186809 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:34:y:2016:i:3:p:174-191
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2016.1186809
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().