Highly effective companies in supplier quality surveillance practices: a quantitative analysis
Thaís da C. L. Alves,
Yoshua Neuman,
Kenneth D. Walsh,
Kim LaScola Needy and
Rufaidah AlMaian
Construction Management and Economics, 2020, vol. 38, issue 3, 239-258
Abstract:
Results presented are part of a larger mixed-mode study on supplier quality practices focusing on the cross-analysis of interviews, focus groups, and a questionnaire, which collected actual data about timing, costs, practices, and non-conformances associated with purchase orders (POs) from Engineering Procure and Construct (EPC) projects for four material types considered relevant to projects built by EPC contractors based in the United States. The present discussion specifically focuses on the analysis of the non-parametric dataset obtained from the POs to investigate a subset of companies labelled as highly effective companies (HECs). This contribution is unique as it used a mixed-mode approach to collect data beyond construction sites and investigate the product/supplier side of construction processes to advance knowledge of how materials can be sent to construction project sites free of defects and rework and indicates practices that contribute to this goal. When compared to other companies in the dataset, HECs engage in more hours of observation in suppliers’ facilities, communicate more often with suppliers, put more effort and time in the planning stages of the project, use more practices related to supplier quality surveillance and supplier quality management, and find non-conformances earlier in the project.
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2019.1590613 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:38:y:2020:i:3:p:239-258
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2019.1590613
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().