EconPapers    
Economics at your fingertips  
 

Resource optimisation in line of balance scheduling

Mohammad A. Ammar

Construction Management and Economics, 2020, vol. 38, issue 8, 715-725

Abstract: The Critical Path Method (CPM) has failed practically for scheduling repetitive projects and Line Of Balance (LOB) has emerged as an alternative for scheduling such projects. Because of the size of most repetitive projects, efficient resource management plays a vital role in their successful implementation. However, resource levelling and allocation have not been formally investigated in repetitive projects. Heuristic methods and optimization techniques have been traditionally used to solve resource scheduling problems like the latter. Although heuristic methods can handle large-size projects, they do not guarantee optimal solutions. In this paper, resource levelling and allocation problems under LOB scheme are modelled as an optimization problem that guarantees optimal solutions. Resource continuity and logical dependency between activities are maintained where constant activity progress rate is assumed. An example project is used to demonstrate the details of model formulation. A complete solution for the range of feasible project durations is obtained as a Time-Resource Trade-Off curve. A pipeline project is used to validate the developed model revealing that the developed model is superior. The proposed model provides contractors with a complete picture for resource usage along with the range of feasible project durations from which the optimal alternative can be selected.

Date: 2020
References: Add references at CitEc
Citations:

Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2019.1606924 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:38:y:2020:i:8:p:715-725

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446193.2019.1606924

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:38:y:2020:i:8:p:715-725