Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry
Suhair Alkilani and
Martin Loosemore
Construction Management and Economics, 2022, vol. 40, issue 10, 743-769
Abstract:
This article addresses a gap in construction project performance measurement research from the perspective of small-medium-sized construction contractors in developing countries. Focussing on small-medium-sized contractors in the Jordanian construction industry, a survey of 231 Jordanian construction professionals was undertaken to investigate how different project stakeholders, intra and extra-organisational relationships and financial and non-financial measures support or hinder the delivery of project outcomes. Using exploratory factor analysis (EFA), confirmatory factor analysis (CFA) and Partial Least Squares Structural Equation Modelling (PLS-SEM) an integrated theoretical performance measurement model was developed and tested which contributes to the advancement of construction project performance measurement research in a number of ways. First, it shows that small-medium-sized contractor project performance is a multi-dimensional, dynamic and contested construct which is bounded by environmental and organisational constraints, and inseparable from mainstream business performance. Second, it shows that performance is measured by six project-related constructs (project cost, time, quality, health and safety, environmental sustainability, and socio-economic performance) and three business-related constructs (profitability, client satisfaction and consultant satisfaction). Third, it shows that four intra-organisational groups of variables (leadership, management capabilities, human resource management and technical capabilities, resources and processes) have a significant impact on the overall project and business performance. Fourth, it shows that four extra-organisational groups of variables (client performance, consultant performance, supplier performance and external attributes) have a significant direct impact on project performance, but no moderating impact was found.
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2022.2108863 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:40:y:2022:i:10:p:743-769
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2022.2108863
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().