Abstract:
Predicting brief clarity and assessing its impact on project performance at an early stage of the project delivery can aid in mitigating possible cost overruns and delays. However, this is extremely challenging because of two main issues: the complexity of multiple interrelationships between factors influenced by the briefing process, and the lack of data at the early stage of the project delivery. This study proposes a hybrid simulation approach that addresses these issues and models the influence of briefing clarity on project cost and time performance. This was achieved by developing a system dynamics (SD) model of the briefing process. The initial brief clarity is predicted using a fuzzy control system. The fuzzy outcomes were compiled into the SD model, and the obtained hybrid model was validated. Finally, the model was applied to refurbishment projects to evaluate its efficiency. The implication for the refurbishment projects shows that by clearly defining the brief, it significantly reduces the detailed design and construction cost and duration. The results confirm that the proposed hybrid method can be effective in evaluating the impact of briefing clarity on project performance, particularly at an early stage where there is a lack of project data.
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2022.2037148 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:40:y:2022:i:4:p:278-295
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2022.2037148
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().