The dynamics of changes in PPP projects – a meta-case analysis approach
Nannan Wang,
Hongmei Wang and
Kui Zhang
Construction Management and Economics, 2022, vol. 40, issue 9, 727-742
Abstract:
Changes in public-private partnership (PPP) projects are inevitable and often lead to project failure, hence, the management of changes in PPP projects are more challenging than with traditional projects. The complex nature of changes in PPP projects, however, lacks systematic investigation and a quantitative approach in current literature. To fill this gap, this study considers the development process of major changes in PPP projects from a whole-life cycle perspective. The findings reveal significant relationships between causes and negative change results, as well as the enlarged interactive effects of certain causes. Most of the negative changes occur at the operational stage and vary across different types of project and regions, but the pre-contract stage is the most critical stage to prevent future negative changes. Hence, more proactive change management strategies are suggested for the government decision makers and project managers. This study contributes to the body of knowledge in PPP literature by providing a meta-case analysis approach, which can improve the accuracy of case selection and facilitate statistical analysis. The findings can help the researchers and practitioners to better understand the nature of changes and manage them in a more efficient way.
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2022.2099561 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:40:y:2022:i:9:p:727-742
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446193.2022.2099561
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().