EconPapers    
Economics at your fingertips  
 

Decoding the dynamics of BIM use practice in construction projects

Yuqing Hu and Carrie S. Dossick

Construction Management and Economics, 2024, vol. 42, issue 5, 451-475

Abstract: Over the past two decades, thought leaders positioned Building Information Modeling (BIM) as a driver to change the Architecture, Engineering, and Construction (AEC) industry. However, instances of unexpected BIM use have surfaced, with projects often shifting from BIM to hybrid or even solely 2D practices midway. What technology use conditions cause these practice-based rejections of BIM use and how these happen have not been fully explored and make BIM cannot fully play its role in a project. To fill this gap, we use structuration theory as a theoretical lens to analyze the interactions between BIM and project teams and explore how three technology use conditions, (interpretive, technological, and institutional), impact the interactions, which finally shape technology use practices. Specifically, a case study method has been selected. The research team attended a project for two years, collected meeting observations, and conducted surveys and interviews to track the emergent and situated BIM use practice in an integrated project setting with technology use conditions that changed over the course of the project. We analyzed how the three technology use conditions impacted the interactions between BIM and project teams in different ways and how these impacted change in different project phases. We conclude that the sustained use of BIM requires the alignment of project organizations with BIM features and alignment with both top-down and bottom-up investment in practice change, which includes motivation for senior management investment in a sustained project team, in individual capability training, and in early planning.

Date: 2024
References: Add references at CitEc
Citations:

Downloads: (external link)
http://hdl.handle.net/10.1080/01446193.2023.2277925 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:42:y:2024:i:5:p:451-475

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20

DOI: 10.1080/01446193.2023.2277925

Access Statistics for this article

Construction Management and Economics is currently edited by Will Hughes

More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:conmgt:v:42:y:2024:i:5:p:451-475