EconPapers    
Economics at your fingertips  
 

Contributing factors to PKK’s failure to implement Mao’s protracted people’s war strategy

Nihat Ali Özcan and Erol Başaran Bural

Small Wars and Insurgencies, 2025, vol. 36, issue 6, 1207-1249

Abstract: This article investigates how and why Mao’s protracted people’s war strategy of three stages (strategic defence, strategic balance, and strategic offence) was chosen and implemented as the main strategy by PKK and why PKK failed in the first stage of this strategy. It explores this failure using an empirical content analysis of primary sources, specifically the documents published by the PKK. The comparative analysis of Mao’s strategy from a military perspective, along with the PKK’s implementation of it, is a main focus of this research. The principal question is ‘What factors contributed to PKK’s failure in implementing Mao’s protracted people’s war strategy, specifically in failing to move beyond the first stage?’ The analysis pinpoints six factors contributing to PKK’s military failure, with the most notable being the shift in Turkish Armed Forces’ strategic approach to counterterrorism, as implemented in 1993.

Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
http://hdl.handle.net/10.1080/09592318.2025.2501984 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:fswixx:v:36:y:2025:i:6:p:1207-1249

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/fswi20

DOI: 10.1080/09592318.2025.2501984

Access Statistics for this article

Small Wars and Insurgencies is currently edited by Paul Rich

More articles in Small Wars and Insurgencies from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-09-05
Handle: RePEc:taf:fswixx:v:36:y:2025:i:6:p:1207-1249