Operational planning level of development in production enterprises in the machine building industry and its impact on the effectiveness of production
Željko Mateljak and
Damir Mihanović
Economic Research-Ekonomska Istraživanja, 2016, vol. 29, issue 1, 325-342
Abstract:
This article examines the interdependence between the operational planning level of development and the effectiveness of the production process. The operational planning level of development has been measured by the scale of six intensity levels (1–6) to evaluate each of the eight targeted tasks (planning raw and materials, work planning, planning tools and equipment, capacity planning, termination of production, scheduling by work centres, drafting and launching of work documentation and various records terms and performance), while the effectiveness of the production process has been measured by the following indicators: productivity, stock turnover rate, capacity utilisation rate, delivery time and fallout ratio. The results have shown that enterprises with higher operational planning level of development present better effectiveness of the production process in comparison to enterprises with less operational planning level of development.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/1331677X.2016.1168041 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:reroxx:v:29:y:2016:i:1:p:325-342
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/rero20
DOI: 10.1080/1331677X.2016.1168041
Access Statistics for this article
Economic Research-Ekonomska Istraživanja is currently edited by Marinko Skare
More articles in Economic Research-Ekonomska Istraživanja from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().