Production planning in maintenance facilities under uncertain repair time
Shayan Tavakoli Kafiabad,
Masoumeh Kazemi Zanjani and
Mustapha Nourelfath
Journal of the Operational Research Society, 2024, vol. 75, issue 6, 1126-1139
Abstract:
Production planning in maintenance facilities that rely on the availability of certified operators is a challenging task. This is primarily attributed to the need for the integration of workforce training with the operations schedule, in addition to the uncertain repair time of some components. We confine our attention to the repair and overhaul of advanced technological devices that are composed of several components. In this context, this study proposes a novel approach to embedding uncertain repair times of faulty components and develops a multi-stage stochastic programming model for integrated production and workforce planning in such facilities under independent random repair time. Our numerical experiments conducted on a range of problem instances expose the significant value of incorporating repair time uncertainty in this problem.
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/01605682.2023.2237068 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tjorxx:v:75:y:2024:i:6:p:1126-1139
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/tjor20
DOI: 10.1080/01605682.2023.2237068
Access Statistics for this article
Journal of the Operational Research Society is currently edited by Tom Archibald
More articles in Journal of the Operational Research Society from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().