Automatic allocation of resources in software process simulations using their capability and productivity
Š Kuchař and
I Vondrák
Journal of Simulation, 2016, vol. 10, issue 3, 227-236
Abstract:
Software processes are very dependent on human behaviour, creativity and productivity. Business process management (BPM) simulation models are trying to model these properties to provide more precise information about the progress and parameters of the process. This paper describes a method for specifying competencies of resources in the process using competency models. These competencies are used to simulate human resource capability and productivity that influences the duration and allocation of resources to activities in the process. Different allocation strategies are based on this capability and productivity model to determine which resources should be allocated during automatic simulations. This method is then integrated into the BPM method simulation environment that is used to compare these allocation strategies in software process simulations for a middle-sized software development company.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1057/jos.2015.8 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tjsmxx:v:10:y:2016:i:3:p:227-236
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/tjsm20
DOI: 10.1057/jos.2015.8
Access Statistics for this article
Journal of Simulation is currently edited by Christine Currie
More articles in Journal of Simulation from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().