Multi-objective meta-heuristics to solve three-stage assembly flow shop scheduling problem with machine availability constraints

Niloofar Shoaardebili and Parviz Fattahi

International Journal of Production Research, 2015, vol. 53, issue 3, 944-968

Abstract: In this paper, a three-stage assembly flow shop scheduling problem with machine availability constraints is taken into account. Two objectives of minimising total weighted completion times (flow time) and minimising sum of weighted tardiness and earliness are simultaneously considered. To describe this problem, a mathematical model is presented. The problem is generalisation of three-machine flow shop scheduling problem and two-stage assembly flow shop scheduling problem. Since these problems are known to be NP-hard, the considered problem is also strongly NP-hard. Therefore, two multi-objective meta-heuristics are presented to efficiently solve this problem in a reasonable amount of time. Comprehensive computational experiments are performed to illustrate the performance of the presented algorithms.

Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (4)

Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2014.948575 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:53:y:2015:i:3:p:944-968

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20

DOI: 10.1080/00207543.2014.948575

Access Statistics for this article

International Journal of Production Research is currently edited by Professor A. Dolgui

More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:tprsxx:v:53:y:2015:i:3:p:944-968