Two-stage flow shop scheduling with dedicated machines
Bertrand M.T. Lin
International Journal of Production Research, 2015, vol. 53, issue 4, 1094-1097
Abstract:
This study is concerned with the manufacturing model that has a common machine at stage one and two parallel dedicated machines at stage two. All jobs need to be processed on the stage-one common machine. After the stage-one processing, the jobs of type 1 (type 2) will route to the first (second) dedicated machine at stage two. We first elaborate several published works on makespan minimisation which are not known to other streams of recent works. While the minimisation of maximum lateness is strongly NP-hard, we develop a linear-time algorithm to solve the case where two sequences of the two job types are given a priori.
Date: 2015
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2014.944631 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:53:y:2015:i:4:p:1094-1097
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2014.944631
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().