Analysis of timeout mechanism in a testing-repair model
Jaehee Kim,
Chang Ouk Kim and
Choonjong Kwak
International Journal of Production Research, 2015, vol. 53, issue 7, 1996-2010
Abstract:
With a dispatching rule collaborated, timeout is an effort to maximise system performance, by disabling the access of a job to a resource when the job keeps the resource idle too long and then by giving a waiting job the access to the resource. This paper first defines a generic testing-repair model with a single tester and proves that there exists at least one optimal solution in two extreme timeout thresholds with respect to the makespan. Experimental results are presented to support the proof. This problem is then formulated as a discrete multi-objective optimisation problem with five common performance measures of production systems. The two extreme timeout thresholds are efficient solutions in all cases, and they are even dominant in several cases. This paper explores the properties of the timeout collaboration protocol and provides useful insights into applying the timeout mechanism to production systems.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2014.944627 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:53:y:2015:i:7:p:1996-2010
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2014.944627
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().