A constructive algorithm and a simulated annealing approach for solving flowshop problems with missing operations
M. Henneberg and
J.S. Neufeld
International Journal of Production Research, 2016, vol. 54, issue 12, 3534-3550
Abstract:
In many practical cases of flowshop environments and especially in flowline manufacturing cells, some or all jobs may not require processing on all machines. Hence, this paper focuses on the flowshop scheduling problem with missing operations. A modification of the constructive NPS-set heuristic is proposed, which generates non-permutation schedules effectively. Furthermore, a two-phase simulated annealing (SA) method is presented that specifically considers missing operations in its procedure. The modified NPS-set heuristic and the two-phase SA are tested and statistically evaluated by an extensive computational study for total flow time criteria. The results show that the modified NPS-set heuristic as well as the specific consideration of missing operations can enhance the algorithms’ performance significantly.
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2015.1082670 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:54:y:2016:i:12:p:3534-3550
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2015.1082670
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().