EconPapers    
Economics at your fingertips  
 

An improved exact algorithm for single-machine scheduling to minimise the number of tardy jobs with periodic maintenance

Ming Liu, Shijin Wang, Chengbin Chu and Feng Chu

International Journal of Production Research, 2016, vol. 54, issue 12, 3591-3602

Abstract: In this paper, we investigate a single-machine scheduling problem with periodic maintenance, which is motivated by various industrial applications (e.g. tool changes). The pursued objective is to minimise the number of tardy jobs, because it is one of the important criteria for the manufacturers to avoid the loss of customers. The strong NP-hardness of the problem is shown. To improve the state-of-the-art exact algorithm, we devise a new branch-and-bound algorithm based on an efficient lower bounding procedure and several new dominance properties. Numerical experiments are conducted to demonstrate the efficiency of our exact algorithm.

Date: 2016
References: View complete reference list from CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2015.1108535 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:54:y:2016:i:12:p:3591-3602

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20

DOI: 10.1080/00207543.2015.1108535

Access Statistics for this article

International Journal of Production Research is currently edited by Professor A. Dolgui

More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:tprsxx:v:54:y:2016:i:12:p:3591-3602