Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times
Xin Feng,
Feifeng Zheng and
Yinfeng Xu
International Journal of Production Research, 2016, vol. 54, issue 12, 3706-3717
Abstract:
This paper studies the makespan minimisation scheduling problem in a two-stage hybrid flow shop. The first stage has one machine and the second stage has m identical parallel machines. Neither the processing time nor probability distribution of the processing time of each job is uncertain. We propose a robust (min--max regret) scheduling model. To solve the robust scheduling problem, which is NP-hard, we first derive some properties of the worst-case scenario for a given schedule. We then propose both exact and heuristic algorithms to solve this problem. In addition, computational experiments are conducted to evaluate the performance of the proposed algorithms.
Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2016.1162341 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:54:y:2016:i:12:p:3706-3717
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2016.1162341
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().