Production control policy for tandem workstations with constant service times and queue time constraints
Kan Wu,
Ning Zhao,
Liang Gao and
C.K.M. Lee
International Journal of Production Research, 2016, vol. 54, issue 21, 6302-6316
Abstract:
Queue time constraints are commonly imposed to ensure product quality in contemporary production systems. We study the performance of two single stations with deterministic service times and a predetermined time window in between, where both stations suffer time-based pre-emptive breakdowns. To improve productivity, achieving higher capacity and lower rework rate are the two main objectives. While higher capacity requires a higher work-in-process (WIP)-level threshold, a lower rework rate requires a smaller one. To quantify the trade-off between the two objectives, an analytical model is derived. The model is then used to derive the WIP-level threshold control policy for a time-constrained system. We also show that system capacity diminishes with the decrease in WIP-level thresholds.
Date: 2016
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2015.1129468 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:54:y:2016:i:21:p:6302-6316
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2015.1129468
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().