A batch scheduling model for m heterogeneous batch processor
Nita P.A. Hidayat,
Andi Cakravastia,
T.M.A. Ari Samadhi and
Abdul Hakim Halim
International Journal of Production Research, 2016, vol. 54, issue 4, 1170-1185
Abstract:
This research addresses a batch scheduling problem for single item parts with multi due date on m heterogeneous batch processors. The objective is to minimise total actual flowtime of parts through the shop. The total actual flowtime of parts in a batch is the multiplication of the interval between batch arrival time and the due date by the number of parts in the batch. Using the actual flowtime as the objective means it is oriented to satisfy the due date as a commitment to customers, and simultaneously to minimise the length of time of the parts spending in the shop. An algorithm to solve this problem is proposed.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2015.1056322 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:54:y:2016:i:4:p:1170-1185
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2015.1056322
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().