EconPapers    
Economics at your fingertips  
 

A Markovian approach for multi-level multi-product multi-period capacitated lot-sizing problem with uncertainty in levels

J. Behnamian, S.M.T. Fatemi Ghomi, B. Karimi and M. Fadaei Moludi

International Journal of Production Research, 2017, vol. 55, issue 18, 5330-5340

Abstract: This paper considers a multi-level, multi-item, multi-period capacitated lot-sizing problem with sequence-dependent family set-up times, set-up carry over and uncertainty in levels due to uncertainty in inspection, rework and scrap. In this study, we, first, determined total processing time for each product of each family. Then, expected number of times associated with visiting each level of each product as well as amount of raw materials are calculated. We developed a mixed integer linear programming model with a numerical example and sensitivity analysis.

Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2017.1311048 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:55:y:2017:i:18:p:5330-5340

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20

DOI: 10.1080/00207543.2017.1311048

Access Statistics for this article

International Journal of Production Research is currently edited by Professor A. Dolgui

More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:tprsxx:v:55:y:2017:i:18:p:5330-5340