Chain-reentrant shop with an exact time lag: new results
Karim Amrouche,
Mourad Boudhar,
Mohamed Bendraouche and
Farouk Yalaoui
International Journal of Production Research, 2017, vol. 55, issue 1, 285-295
Abstract:
The two-machine chain-reentrant shop scheduling with the objective of minimizing the makespan, assumes that the tasks pass from the first machine to the second and return back to the first machine. In this paper, we consider the same problem in which an exact time lag between the two operations on the first machine is imposed. In Amrouche and Boudhar (2016) the authors proved that this problem is NP-hard in the strong sense in the case of identical time lags lj=L$ l_j=L $. We propose heuristic algorithms with empirical results for the latter. In addition, we establish a new NP-hardness result and some polynomial cases.
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2016.1205235 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:55:y:2017:i:1:p:285-295
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2016.1205235
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().