Abstract:
Materials Requirement Planning (MRP) technique is widely employed by most manufacturing companies, even though field applications point out some weaknesses, including ignored production capacity constraints and fixed lead-times. These weaknesses often lead to infeasible production schedules, which trigger fluctuating workloads over time, significant adjustment effort and eventually unpredictably long lead times. This paper introduces a capacity-oriented MRP procedure that combines the traditional MRP procedure with an approach based on linear programming: in this way, requirement of lead times pre-determined a priori outside the MRP procedure is overcome. The new procedure is then applied to a real-life company and results highlight that feasible plans of orders are generated without requiring lead-times as input and without relevant computational burden.
Date: 2017
References: View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2016.1177235 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:55:y:2017:i:2:p:377-391
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2016.1177235
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().