Optimal utilisation level for lean product development in a multitasking context
Yvan Beauregard,
Vladimir Polotski,
Nadia Bhuiyan and
Vincent Thomson
International Journal of Production Research, 2017, vol. 55, issue 3, 795-818
Abstract:
Flow of information is of utmost importance during product development (PD) endeavours with timely feedback supporting the resolution of higher risk elements. PD task size, multitasking and resource utilisation levels of the PD system influence information flow and the value ultimately realised from the investment in PD. In this paper, a model incorporating a methodology developed using queuing theory, and in particular, results obtained for Jackson networks are extended to help engineering management to improve PD task flow and consequently become more ‘lean’. Considered factors include: optimal PD task size and multitasking (focus) level as well as the utilisation level of PD resources. Empirical data were collected from a case study company and compared to optimal values. The benefits of the proposed model and approaches are discussed.
Date: 2017
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2016.1213448 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:55:y:2017:i:3:p:795-818
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2016.1213448
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().