Lot-sizing in a multi-stage flow line production system with energy consideration
Oussama Masmoudi,
Alice Yalaoui,
Yassine Ouazene and
Hicham Chehade
International Journal of Production Research, 2017, vol. 55, issue 6, 1640-1663
Abstract:
In this paper, a single-item capacitated lot-sizing problem in a flow-shop system with energy consideration is studied. The planning horizon is defined by a set of periods where each one is characterised by a length, an allowed maximal power, an electricity price, a power price and a demand. The objective is to determine the quantities to be produced by each machine at each period while minimising the production cost in terms of electrical, inventory, set-up and power required costs. For medium- and large-scale problems, lot-sizing problems are hard to solve. Therefore, in this study, two heuristics are developed to solve this problem in a reasonable time. To evaluate the performances of these heuristics, computational experiments are presented and numerical results are discussed and analysed.
Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2016.1206670 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:55:y:2017:i:6:p:1640-1663
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2016.1206670
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().