Two-machine flow shop problem with unit-time operations and conflict graph
Nour El Houda Tellache and
Mourad Boudhar
International Journal of Production Research, 2017, vol. 55, issue 6, 1664-1679
Abstract:
This paper addresses the problem of scheduling, on a two-machine flow shop, a set of unit-time operations subject to the constraints that some conflicting jobs cannot be scheduled simultaneously on different machines. In the context of our study, these conflicts are modelled by general graphs. The problem of minimising the maximum completion time (makespan) is known to be NP-hard in the strong sense. We propose a mixed-integer linear programming (MILP) model. Then, we develop a branch and bound algorithm based on new lower and upper bound procedures. We further provide a computer simulation to measure the performance of the proposed approaches. The computational results show that the branch and bound algorithm outperforms the MILP model and can solve instances of size up to 20,000 jobs.
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2016.1206672 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:55:y:2017:i:6:p:1664-1679
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2016.1206672
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().