EconPapers    
Economics at your fingertips  
 

Gantry crane scheduling in intermodal rail-road container terminals

Peng Guo, Wenming Cheng, Yi Wang and Nils Boysen

International Journal of Production Research, 2018, vol. 56, issue 16, 5419-5436

Abstract: Modern rail-road container terminals serve as important consolidation nodes in intermodal transportation networks where containers are transferred between freight trains and trucks. Among the most important decision problems in these yards is the crane scheduling problem, which decides on the sequences of container moves executed by each of the parallel gantry cranes. This paper treats a rich crane scheduling problem, which considers plenty relevant constraints and is directly applicable in Chinese intermodal terminals. For solving this problem, we propose a fix-and-optimise procedure, which is easy to implement and shown to successfully solve even large-sized instances with 100 container moves in reasonable time.

Date: 2018
References: Add references at CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2018.1444812 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:56:y:2018:i:16:p:5419-5436

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20

DOI: 10.1080/00207543.2018.1444812

Access Statistics for this article

International Journal of Production Research is currently edited by Professor A. Dolgui

More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:tprsxx:v:56:y:2018:i:16:p:5419-5436