An integrated model for multi-resource constrained scheduling problem considering multi-product and resource-sharing
Changchun Liu,
Xi Xiang,
Li Zheng and
Jing Ma
International Journal of Production Research, 2018, vol. 56, issue 19, 6491-6511
Abstract:
This paper studies a multi-resource constrained scheduling problem considering multi-product and resource-sharing in the manufacturing supply chain, in which many independent production units coordinate with a truck resource manager. A mixed integer programming model is formulated to minimise the total system cost and some analytical properties are proposed to tighten the model. A Lagrangian relaxation-based heuristic with several enhancements, e.g. warm startup, approximating solve and parallel computation of subproblems, is proposed to solve the model. Finally, computational experiments are conducted to verify that (i) the proposed method has a better performance in both objective and CPU time than CPLEX, (ii) all three enhancements can help reduce the total computation time and (iii) a certain degree of resource-sharing can help reduce the total cost of the system.
Date: 2018
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2017.1363428 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:56:y:2018:i:19:p:6491-6511
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2017.1363428
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().