Parallel machine, capacitated lot-sizing and scheduling for the pipe-insulation industry
Jésica de Armas and
Manuel Laguna
International Journal of Production Research, 2020, vol. 58, issue 3, 800-817
Abstract:
We develop a solution procedure for a production problem that involves the optimal lot-sizing and scheduling of multiple products on parallel machines over a long planning horizon. The objective is to determine the product assignment, production quantities, and production sequence on each machine in order to meet demand and maximise the total production amount in a given planning horizon. We study this problem in the context of the manufacturing of pipe insulation, in which multiple features have to be considered simultaneously. The solution procedure combines mathematical programming and a post-processing sequencing heuristic. We also develop a procedure to determine safety stock levels and use Monte Carlo simulation to assess the risk associated with inventory shortages due to stochastic production rates. Computational tests are performed on both real and artificially-generated data.
Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2019.1600763 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:58:y:2020:i:3:p:800-817
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2019.1600763
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().