Scheduling in a no-wait flow shop to minimise total earliness and tardiness with additional idle time allowed
Jeffrey Schaller and
Jorge M. S. Valente
International Journal of Production Research, 2022, vol. 60, issue 18, 5488-5504
Abstract:
Scheduling jobs in a no-wait flow shop with the objective of minimising total earliness and tardiness is the problem addressed in this paper. Idle time may be needed on the first machine due to the no-wait restriction. A model is developed that shows additional idle can be inserted on the first machine to help reduce earliness. Several dispatching heuristics previously used in other environments were modified and tested. A two-phased procedure was also developed, estimating additional idle in the first phase, and applying dispatching heuristics in the second phase. Several versions of an insertion improvement procedure were also developed. The procedures are tested on instances of various sizes and due date tightness and range. The results show the two-phase heuristics are more effective than the simple rules, and the insertion search improvement procedure can provide considerable improvements.
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/00207543.2021.1962017 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:tprsxx:v:60:y:2022:i:18:p:5488-5504
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/TPRS20
DOI: 10.1080/00207543.2021.1962017
Access Statistics for this article
International Journal of Production Research is currently edited by Professor A. Dolgui
More articles in International Journal of Production Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().