Quantifying Decommissioning Risk in the Deepwater Gulf of Mexico
Mark J. Kaiser and
Mingming Liu
The Engineering Economist, 2015, vol. 60, issue 1, 40-74
Abstract:
Deepwater oil and gas structures are expensive to install and will be expensive to dismantle when the asset no longer serves a useful purpose. Deepwater structures present special risk because decommissioning expenditures are expected to cost tens to hundreds of millions of dollars to perform, and occur when the asset no longer generates revenue. An analytic framework is presented to quantify the decommissioning risk of offshore structures by comparing the value of an asset's reserves to its undiscounted asset retirement obligations. The procedure is applied to the deepwater fixed platform and compliant tower inventory in the Gulf of Mexico circa January 2013.
Date: 2015
References: Add references at CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2014.932036 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:60:y:2015:i:1:p:40-74
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2014.932036
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().