A systematic frame work of schedule risk management for power grid engineering projects,sustainable development
Wajiha Ansari (),
Muhammad Asim and
Salman Manzoor
Additional contact information
Wajiha Ansari: MBA Student Karachi University Business School, University of Karachi Pakistan
Muhammad Asim: Chairperson Karachi University Business School, University of Karachi, Pakistan
Salman Manzoor: Education and Literacy Department, Government of Sindh, Pakistan
Technium Social Sciences Journal, 2020, vol. 5, issue 1, 185-216
Abstract:
Design dangers are the key risk for extraordinary viability of timetable organization in (PGEP). This paper intends to manufacture a methodically system for design RM, which comprises of three measurements, including the work force measurement, technique measurement and time measurement, explicitly supervisory faculty, the executives strategies and the development procedure, consistently. Responsibilities of staff with different capacities are examined in the supervisory faculty part, and six phases and their concurring 40 key works are guaranteed as the time measurement. RI, assessment, appraisal and expectation together framed the technique measurement. In view of this foundation, 222 planned dangers happen in the entire procedure of PGEPs are distinguished through questionnaires and interviews. At that point, the connection among each hazard is made sense of dependent on the Interpretative Structure Model (ISM) technique and the effect of each hazard is quantitatively surveyed by setting up assessment framework. The genuine act of the planned system is checked through the investigation of the primary phase of a PGEP. At long last, the outcomes show that this structure of planned RM is significant for refining the productivity of PM. It gives administrators a more clear methodology with which to lead RM encourages them to opportune recognize chances and keep dangers from happening. It is likewise simple for administrators to pass judgment on the impact level of each hazard, so they can take activities dependent on the degree of each hazard's seriousness. Generally speaking, it is gainful for power lattice endeavours to accomplish a feasible administration.
Keywords: power grid engineering project; schedule management; risk management; Interpretative Structure Model; Analytic Hierarchy Process (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://techniumscience.com/index.php/socialsciences/article/view/167/102 (application/pdf)
https://techniumscience.com/index.php/socialsciences/article/view/167 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:tec:journl:v:5:y:2020:i:1:p:185-216
Access Statistics for this article
Technium Social Sciences Journal is currently edited by Tasente Tanase
More articles in Technium Social Sciences Journal from Technium Science
Bibliographic data for series maintained by Tasente Tanase ( this e-mail address is bad, please contact ).