Investigating the risk of international construction projects using artificial-fuzzy neural networks technique
Ali Kermanimoghaddam
Additional contact information
Ali Kermanimoghaddam: Master of Construction and Project Management ,Islamic Azad University, Mashhad branch
Technium Sustainability, 2023, vol. 3, 36-40
Abstract:
The purpose of implementing the risk management process is to identify and root the causes of each risk, analyze it, plan response methods and assign risks to appropriate factors, in order to effectively control the preferred risks. This article aims to analyze risk management in construction projects using fuzzy artificial neural networks in the form of a descriptive-survey study and in the category of applied research. Data analysis was done using MATLAB software using MATLAB software to ensure the soundness of the method and to implement project risk management in international construction projects, and the results indicate success in terms of risk.
Date: 2023
References: Add references at CitEc
Citations:
Downloads: (external link)
https://techniumscience.com/index.php/sustainability/article/view/8603 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:tec:sustai:ojs:8603
DOI: 10.47577/sustainability.v3i.8603
Access Statistics for this article
Technium Sustainability is currently edited by Tasente Tanase
More articles in Technium Sustainability from Technium Science
Bibliographic data for series maintained by Tasente Tanase ( this e-mail address is bad, please contact ).