Analysis of alternative selection for vertical clearance design under Tabalong Bridge of PT Adaro Indonesia
Diean Oktavian Regar and
Aqli Mursadin
Additional contact information
Diean Oktavian Regar: Faculty of Engineering, Lambung Mangkurat University, Jl. A. Yani Km. 35.8, South Borneo, Indonesia
Aqli Mursadin: Faculty of Engineering, Lambung Mangkurat University, Jl. A. Yani Km. 35.8, South Borneo, Indonesia
Technium, 2022, vol. 4, issue 1, 7-30
Abstract:
PT Adaro Indonesia is trying to adjust a vertical clearance under Tabalong Bridge 1 (unloaded) and Tabalong Bridge 2 (loaded) because the existing conditions still apply a minimum vertical clearance of 4 m. I t should be in accordance with latest Regulation of the Minister of Public Works No. 19/PRT/M/2011 that for vertical clearance above national road at least 5.1 m. This specification has not been met by the national road under the Tabalong 1 & 2 Bridges bec ause both bridges were built in the 90s. Therefore we need an engineering technique to overcome this. There are 2 alternative designs, namely lowering the elevation of the national road and increasing the elevation of the bridge's upper structure to mitiga te oversized vehicles so as not to hit the lower structure of the Tabalong bridge. In determining the selection of the best alternative designs in this research is based on two (2) things, non financial criteria with Analytical Hierarchy Process (AHP) and financial criteria with Life Cycle Cost Analysis (LCCA)/Benefit Cost Ratio (BCR) method. This study uses a survey method by distributing questionnaires and interviews as a means of collecting primary data. In addition, previous research and consultant DED documents were used as a means of collecting secondary data. The AHP method is used to process primary data to produce a decision from a non financial aspect. While the LCC/BCR method is used to process secondary data to produce a decision from the financi al aspect . The results of the AHP analysis obtained that the synthesis value of the decision the option of lowering national roads was 85% and the bridge lifting option was 15% and the consistency ratio (CR) was 0.05 1 and NPV = Rp. 43,442,264,804.34 > 1 means that the option lowering national roads is feasible. While the bridge li fting option is obtained by analyzing the value of BCR = 0.98
Date: 2022
References: Add references at CitEc
Citations:
Downloads: (external link)
https://techniumscience.com/index.php/technium/article/view/5600 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:tec:techni:ojs:5600
DOI: 10.47577/technium.v4i1.5600
Access Statistics for this article
Technium is currently edited by Scurtu Ionut Cristian
More articles in Technium from Technium Science
Bibliographic data for series maintained by Ana Maria Golita ().