Production Planning and Control of Flooring Using Aggregate Planning Method
Rusindiyanto ()
Technium, 2023, vol. 16, issue 1, 397-404
Abstract:
PT. X a is a private company engaged in the wood processing industry. To avoid production excesses or shortages in the company, production planning using the Aggregate Planning Method can be utilized to meet all consumer demands. The variables used include demand data, production costs, setup costs, and manufacturing time. Through this research, the company can fulfill consumer demands and minimize production costs by implementing aggregate planning. Additionally, the company can forecast future demand, enabling them to anticipate fluctuations in consumer demand. By using aggregate production planning, a total production time of 8657 hours can be scheduled to fulfill a demand of 7121 m3. The cost savings achieved after implementing aggregate planning. The total proposed production cost using aggregate planning is IDR.1.383.921.682 and actual cost is IDR 1.477.900.968. So that the company can save production costs of IDR 93,979,286 or 6.35%. For the total production cost of the upcoming year 2023 by implementing aggregate planning based on the forecasting data, the cost is IDR 1.534.711.812.
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://techniumscience.com/index.php/technium/article/view/10018/3829 (application/pdf)
https://techniumscience.com/index.php/technium/article/view/10018 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:tec:techni:v:16:y:2023:i:1:p:397-404
DOI: 10.47577/technium.v16i.10018
Access Statistics for this article
Technium is currently edited by Scurtu Ionut Cristian
More articles in Technium from Technium Science
Bibliographic data for series maintained by Ana Maria Golita ().