Delay Factors of Construction Projects in Oman
Amur Ali Mussallam Al Amri ()
Technium, 2022, vol. 4, issue 8, 1-10
Abstract:
The construction industry is the second largest economic sector of the Sultanate of Oman. The construction industry plays important role in infrastructural development both for the public and private sectors. The delays in construction projects impact directly the economic development of the country. The present study aimed to analyze the delays in a construction project by conducting a survey based on a questionnaire. The questionnaire survey is answered by 74 respondents and the quantitative data is further subjected to statistical analysis. The results are further tested through the Pearson chi-square test of independence and Cramer’s V tests. The results show that several factors contribute to the project delays in Oman including cultural differences, design changes, poor project management, and changes in project scope at the time of project execution. The managerial issues involved payment delays to contractors and authoritarian delays. The clients faced poor planning and execution of the project by the contractor and sub-contracting of the critical project phases.
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://techniumscience.com/index.php/technium/article/view/7238 (application/pdf)
https://techniumscience.com/index.php/technium/article/download/7238/2548 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:tec:techni:v:4:y:2022:i:8:p:1-10
DOI: 10.47577/technium.v4i8.7238
Access Statistics for this article
Technium is currently edited by Scurtu Ionut Cristian
More articles in Technium from Technium Science
Bibliographic data for series maintained by Ana Maria Golita ().