Delay Fees in the Procurement of Construction Projects

Johan Nyström, Jan-Eric Nilsson and Maria Börjesson

Journal of Transport Economics and Policy, 2019, vol. 53, issue 4, 348--363

Abstract: This paper suggests Delay Fees (DF) to handle temporary congestion during road works. The DF is paid by the contractor based on road users' loss of travel time due to construction. This decentralises the trade-off between construction costs and user time to the contractor, increasing social welfare. The contractor not only will account for user time during each single project, but also is incentivised to develop innovative construction techniques. Compared to other means in the literature for reducing temporary construction, the DF is more general in its focus on user time rather than lane closure.

Date: 2019
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.jstor.org/stable/26800460

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:tpe:jtecpo:2019:53:4:348--363

Access Statistics for this article

Journal of Transport Economics and Policy is currently edited by B T Bayliss, S A Morrison, A Smith and D Graham

More articles in Journal of Transport Economics and Policy from University of Bath
Bibliographic data for series maintained by Christopher F. Baum ().

 
Page updated 2025-03-20
Handle: RePEc:tpe:jtecpo:2019:53:4:348--363