Reliability Level of in the Production Schedule Design in the Construction Company
Velina Yordanova
Business & Management Compass, 2013, issue 3, 65-73
Abstract:
A reliable production schedule is an important prerequisite for the achievement of good economic results on the part of the construction enterprise and for ensuring rhythmical and effective work in its functioning. In this respect in the present article there are considered the peculiarities of the production schedule, which we believe it is necessary to consider during its development. Taking into consideration the characteristics of construction production there is made an attempt at proposing an economic and mathematical model for assessing the level of reliability in the formation of a production schedule for the construction enterprise.
Keywords: production schedule; reliability; construction enterprise (search for similar items in EconPapers)
JEL-codes: C19 D24 (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:
Downloads: (external link)
http://journal.ue-varna.bg/uploads/20150220081131_51813678454e6ec3396df2.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vrn:journl:y:2013:i:3:p:65-73
Access Statistics for this article
Business & Management Compass is currently edited by Julian Vasilev
More articles in Business & Management Compass from University of Economics Varna Contact information at EDIRC.
Bibliographic data for series maintained by Yana Doneva ().