EconPapers    
Economics at your fingertips  
 

Factors Influencing Professional Indemnity Insurance Use in Construction Risk Management

Ngoy Kabemba S. (), Chisumbe Sampa, Petere Gaida, Mwiya Balimu and Mwanaumo Erastus
Additional contact information
Ngoy Kabemba S.: University of Zambia, Lusaka, Zambia
Chisumbe Sampa: University of South Africa, Pretoria, South Africa
Petere Gaida: Riga Technical University, Riga, Latvia
Mwiya Balimu: University of Zambia, Lusaka, Zambia
Mwanaumo Erastus: University of Zambia, Lusaka, Zambia

Baltic Journal of Real Estate Economics and Construction Management, 2023, vol. 11, issue 1, 199-220

Abstract: Despite convergence shown by different schools of thought on the correlation between efficient risk management practices and enhanced delivery of sustainable construction projects, the knowledge gap on the use of professional indemnity insurance (PII) is still persistent in Africa, particularly in Zambia. This paper examined factors influencing the use of PII to manage construction risks. It has identified the main factors influencing the use of PII, assessed their influence and respondents’ consensus level in the Zambia context. Data were collected qualitatively using a two-round Delphi survey. Ten field experts were selected, including construction professionals, contractors and surety providers. Experts’ opinion positioned premium and legal framework as highly influential with a median of within the range of 9 to 10; surety prequalification and stakeholders’ interest as being influential with a median equal to 7. Except for surety prequalification and stakeholders’ interest, which had weak consensus with an Interquartile Range greater than or equal to 2.75, the other six factors (surety service quality, surety, construction firm relationships, competition in the industry, and construction firm level of awareness) reached a good consensus with an Interquartile Range within the range of 1 to 2.75. Embedded with the ability to influence other factors, legal framework acts as focal point to improve access of PII and therefore needs adequate and contextualized amendments.

Keywords: Professional indemnity insurance; risk management; design build; BIM; design error/omission (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/bjreecm-2023-0013 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:bjrecm:v:11:y:2023:i:1:p:199-220:n:3

DOI: 10.2478/bjreecm-2023-0013

Access Statistics for this article

Baltic Journal of Real Estate Economics and Construction Management is currently edited by Ineta Geipele

More articles in Baltic Journal of Real Estate Economics and Construction Management from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:bjrecm:v:11:y:2023:i:1:p:199-220:n:3