Building production management practice in the construction industry in Nigeria

Osuizugbo Innocent Chigozie () and Ojelabi Raphael Abiodun
Additional contact information
Osuizugbo Innocent Chigozie: Bells University of Technology, Nigeria
Ojelabi Raphael Abiodun: Covenant University, Nigeria

Engineering Management in Production and Services, 2020, vol. 12, issue 2, 56-73

Abstract: Growing demands for building projects result from economic development. The building industry is dynamic and multifaceted. Efficient and effective practice of building production management (BPM) is required to successfully execute projects and achieve project goals upon completion as well as functionality aims for the lifespan of a building. This research aims to determine factors that influence the BPM practice in the Nigerian construction industry, particularly; during the project execution phase. A cross-sectional survey used; a questionnaire to identify 73 factors, which were grouped into 12 categories and assessed. A purposive sampling technique was used to identify 20 construction organisations specialising in building production management in Lagos, Nigeria. 114 questionnaires were distributed to the pool of stakeholders, which included 31 clients, 34 consultants and 49 contractors of current and past building production projects carried out by the selected firms in Lagos. The research used a selection of statistical tools for SPSS v.23, including the chi-square test, the Kruskal-Wallis test and Kendall's coefficient of concordance. The obtained result revealed the factors that mostly influence the BPM practice namely, architectural drawings, the construction programme document, the work breakdown structure, the adequacy of communication and coordination between the parties, the adequacy of raw materials and equipment, the availability of the competent team, the implementation of the safety management system, regular maintenance of project equipment, clear and timely inspections, the availability of funds as planned throughout the project duration, the availability of skilled personnel, and the aesthetics of the completed work. The research resulted in the development of the BPM implementation framework and recommendations for the improvement of the BPM practice in Nigeria.

Keywords: building production management; practice; Nigerian construction industry; theory; critical success factors (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/emj-2020-0011 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:ecoman:v:12:y:2020:i:2:p:56-73:n:4

DOI: 10.2478/emj-2020-0011

Access Statistics for this article

Engineering Management in Production and Services is currently edited by Joanna Ejdys

More articles in Engineering Management in Production and Services from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:ecoman:v:12:y:2020:i:2:p:56-73:n:4