Methodology for bottleneck identification in a production system when implementing TOC
Urban Wieslaw and
Rogowska Patrycja ()
Additional contact information
Urban Wieslaw: Bialystok University of Technology, Poland
Rogowska Patrycja: Bialystok University of Technology, Poland
Engineering Management in Production and Services, 2020, vol. 12, issue 2, 74-82
Abstract:
For TOC (Theory of Constraints) implementation in a production system, the determination of the system's bottleneck is a crucial step. Effective bottleneck identification allows setting priorities for the improvement of a production system. The article deals with a significant problem for the manufacturing industry related to the location of a bottleneck. The article aims for a detailed analysis of methods for bottleneck identification based on a comprehensive literature review and the design of a generalised methodology for bottleneck identification in the production system. The article uses two research methods, first, the combination of a narrative and scoping literature review, and second, the logical design. Several methods for bottleneck identification are reviewed and compared, finding some being similar, and others giving new insights into the evaluated production system. A methodology for bottleneck identification is proposed. It contains several detailed methods arranged in coherent steps, which are suggested to be followed when aiming for the recognition of a production system's bottleneck. The proposed methodology is expected to be helpful in the practical TOC implementation. The presented methodology for the identification of bottlenecks in a production system is a practical tool for managers and experts dealing with TOC. However, it is still a conceptual proposal that needs to be tested empirically. The proposed methodology for bottleneck identification is an original concept based on the current literature output. It contributes to the production management theory as a practical managerial tool.
Keywords: Theory of Constraints; TOC; production improvement; bottleneck identification; constraints (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.2478/emj-2020-0012 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vrs:ecoman:v:12:y:2020:i:2:p:74-82:n:5
DOI: 10.2478/emj-2020-0012
Access Statistics for this article
Engineering Management in Production and Services is currently edited by Joanna Ejdys
More articles in Engineering Management in Production and Services from Sciendo
Bibliographic data for series maintained by Peter Golla ().