EconPapers    
Economics at your fingertips  
 

Impact of cash flow variation on project performance: contractors’ perspective

Tarawneh Sultan (), Almahmoud Anoud Fawwaz and Hajjeh Hassan
Additional contact information
Tarawneh Sultan: Mutah University, Applied Science Private University, Jordan
Almahmoud Anoud Fawwaz: Mutah University, Jordan
Hajjeh Hassan: Applied Science, Private University, Jordan, MEU Research Unit, Middle East University, Amman, Jordan

Engineering Management in Production and Services, 2023, vol. 15, issue 1, 73-85

Abstract: This study aims to determine the impact of cash flow variation in Jordanian construction projects from contractors’ perspective and its relationship with project performance. An online questionnaire was developed and distributed to a selective sample. The respondents were project managers from contracting companies working in Jordan, around 340 construction companies. The sample frame was a form of non-probability sampling of 181 project managers. The collected data were analysed using the Statistical Package of the Social Sciences (SPSS) version 25. The study results showed a positive statistically significant effect at the significance level (α ≤0.05) of cash flow variation on project performance in Jordanian construction projects. In addition, respondents indicated a high level of agreement on the impact of cash flow variation on projects’ performance, with a mean of 4.01 and a standard deviation of .546. However, on the project performance dimensions’ level, Quality came first, with a mean of 4.11 and at a high level, followed by Safety, with a mean of 4.01 and at a high level, while Final Cost ranked third with a mean of 3.96 and at a high level. Finally, Project Final Duration ranked fourth with a mean of 3.95. The researchers recommended the necessity of more efforts for a better understanding of the importance of cash flow by contractors to schedule project activities correctly and efficiently to maintain a steady state of the project cash flow.

Keywords: cash flow; project performance; Jordan; construction; cash variation; contractors; quality (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/emj-2023-0006 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:ecoman:v:15:y:2023:i:1:p:73-85:n:3

DOI: 10.2478/emj-2023-0006

Access Statistics for this article

Engineering Management in Production and Services is currently edited by Joanna Ejdys

More articles in Engineering Management in Production and Services from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:ecoman:v:15:y:2023:i:1:p:73-85:n:3