EconPapers    
Economics at your fingertips  
 

Factors Militating Against Prompt Delivery of Construction Projects in Lagos Megacity, Nigeria: Contractors’ Perspective

Ogunde Ayodeji Olubunmi, Akinola Gbemisola Ajoke, Ogundipe Kunle Elizah, Ademola Sakariyau Adeboye, Akuete Eseohe, Olaniran Hezekiah Farayola, Dafe Odje Emmanuel and Oloke Olayinka Clement
Additional contact information
Olaniran Hezekiah Farayola: Department of Building Technology, Covenant University, Ogun State, Nigeria
Dafe Odje Emmanuel: Eseohe Akuete Hezekiah Farayola Olaniran Department of Building Technology, Covenant University, Ogun State, Nigeria
Oloke Olayinka Clement: Department of Estate Management, Covenant University, Ogun State, Nigeria

Mediterranean Journal of Social Sciences, 2017, vol. 8, issue 3, 233-242

Abstract: Delay is a common issue faced in the construction industry all over the world especially in developing countries. The aim of this study is to evaluate factors causing delays and their effects on construction projects in Lagos Mega City, Nigeria from the contractors’ perspective. It is predicated on the incessant delay experienced by contractors on construction projects. Purposive sampling method was adopted for the study;. Quantitative data was obtained by administration of One hundred (100) structured questionnaires distributed to contractors of construction project sites in Lagos State and Qualitative data was obtained from interview of key management personnel of the companies and journals. Ranking analysis of the 33 major causes of delays identified through literature review using Relative Importance Index (RII) showed that cash flow problems during construction (RII=4.81), clients’ financial difficulties (RII=4.47) and poor procurement (RII=4.40) were the most importantt causes of delays in construction project sites in Lagos State, Cost overrun (RII=4.92), late payment (RII=4.59) and project extension (RII=4.45) were predominant effects of delay in construction project. Hypotheses testing on relationship between shortage of skilled labour, improper equipment during construction and delay in construction project using One-Way ANOVA showed positive correlation. For improved efficiency and effective project delivery in the industry, proper payment from client (RII=4.78), competent project managers (RII=4.64), the use of experienced subcontractors and suppliers (RII=4.48) should be encouraged to mitigate against delay in construction projects.

Keywords: Contractors; construction; delay; Nigeria; project (search for similar items in EconPapers)
Date: 2017
References: Add references at CitEc
Citations:

Downloads: (external link)
https://doi.org/10.5901/mjss.2017.v8n3p233 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:mjsosc:v:8:y:2017:i:3:p:233-242:n:18

DOI: 10.5901/mjss.2017.v8n3p233

Access Statistics for this article

Mediterranean Journal of Social Sciences is currently edited by Alessandro Figus

More articles in Mediterranean Journal of Social Sciences from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:mjsosc:v:8:y:2017:i:3:p:233-242:n:18