EconPapers    
Economics at your fingertips  
 

An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario

Deep Shumank (), Simon Laura, Asim Mohd, Rahimzadeh Ali and Al-Hamdani Sulala
Additional contact information
Deep Shumank: University of Newcastle, Newcastle,NSW, Australia
Simon Laura: School of Architecture and Built Environment, University of Newcastle,Callaghan, NSW 2308, Australia
Asim Mohd: Department of Civil Engineering, Himalayan Institute of Technology and Management,Lucknow, India
Rahimzadeh Ali: School of Architecture and Built Environment, University of Newcastle,Callaghan, NSW 2308, Australia
Al-Hamdani Sulala: School of Architecture and Built Environment, University of Newcastle,Callaghan, NSW 2308, Australia

Organization, Technology and Management in Construction, 2018, vol. 10, issue 1, 1794-1802

Abstract: Purpose: Recent studies show that lowest bidder tech­nique is mainly used in developing countries such as India to award a contract. It has been demonstrated that the lowest bid is not always the accurate one and can lead to cost overruns and time extensions amongst other prob­lems. The aim of this study was to investigate the critical factors impacting contractor’s efficiency in Indian con­struction projects. Research approach: A survey was sent to participants of construction projects awarded by the government with the lowest bidder technique in Uttar Pradesh, India. For further research, snowball sampling was used, and struc­tured interviews were conducted amongst experienced managers and engineers of these projects on both client’s and contractor’s side.Findings: It was observed that, to a greater extent, the delays were caused due to contractor’s opportunistic behaviour. The main findings are that new bidding meth­odologies are to be tested as they can lead to the choice of a more accurate and realistic bidder. In addition, subjec­tive evaluation components, such as schedule and work­force, should be reflected in contract award methods in addition to the cost criteria. Further studies should be per­formed on the choice of contract awarding methodology based on the project size and type. Originality value: The researcher’s focus was to analyze the influence of contracting methodologies and factors affecting contractor’s performance in lowest bid award project, where this is an area of least focus amongst researchers in the Indian subcontinent.

Keywords: project management; construction industry; contractor performance; construction management (search for similar items in EconPapers)
Date: 2018
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/otmcj-2018-0010 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:10:y:2018:i:1:p:1794-1802:n:15

DOI: 10.2478/otmcj-2018-0010

Access Statistics for this article

Organization, Technology and Management in Construction is currently edited by Mladen Radujković

More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:otamic:v:10:y:2018:i:1:p:1794-1802:n:15