EconPapers    
Economics at your fingertips  
 

Identifying New Knowledge Areas to Strengthen the Project Management Institute (PMI) Framework

Iyer K. Chandrashekhar () and Banerjee Partha S.
Additional contact information
Iyer K. Chandrashekhar: Indian Institute of Technology Delhi, New Delhi, DelhiIndia
Banerjee Partha S.: DEFT Advisory and Research, New Delhi (India)

Organization, Technology and Management in Construction, 2019, vol. 11, issue 1, 1892-1903

Abstract: In an increasingly volatile, uncertain, complex and ambiguous (VUCA) world, managers of capital projects are under relentless pressure to consistently meet their performance expectations. At the execution stage, managers have to constantly orchestrate competing demands on scare resources and, simultaneously, manage project operations to meet time, costs and quality compliances. This calls for simple methods to distinguish factors that could cause execution stage delays and prioritise their remedial actions. The objective, therefore, was to propose and test a methodology through empirical evidence, which could be useful for managers to focus on the distinguishing factors (rather than on all factors) to achieve execution excellence. We used a three-stage methodology leveraging the existing Project Management Institute (PMI) framework to define variables and then tested the methodology using case data generated from projects adopting a grounded theory approach. A set-theoretic, multi-value qualitative comparative analysis (QCA) tool helped appropriately configure this empirical case data and a subsequent Boolean minimisation technique then identified the distinguishing factor(s) that explained superior project schedule performance. The results corroborated literature findings. Two contributions emerged from this study: (a) our methodology enabled a richer analysis of the case than what would have been possible by adopting a more conventional approach; and (b) there is a potential for a domain-specific extension of the PMI framework to cover technology transfer projects having their unique knowledge areas.

Keywords: qualitative comparative analysis; grounded theory; causal factors; project performance (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/otmcj-2018-0014 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:11:y:2019:i:1:p:1892-1903:n:3

DOI: 10.2478/otmcj-2018-0014

Access Statistics for this article

Organization, Technology and Management in Construction is currently edited by Mladen Radujković

More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:otamic:v:11:y:2019:i:1:p:1892-1903:n:3