Capability improvement measures of the public sector for implementation of building information modeling in construction projects
Yusuf Anthony Olukayode,
Opawole Akintayo (),
Musa Nofiu Abiodun,
Kadiri Dele Samuel and
Ebunoluwa Esther Ilori
Additional contact information
Yusuf Anthony Olukayode: Department of Quantity Surveying, Faculty of Environmental Design & Management Obafemi Awolowo University, Ile-Ife, Nigeria
Opawole Akintayo: Department of Quantity Surveying, Faculty of Environmental Design & Management Obafemi AwolowoUniversity, Ile-Ife, Nigeria.
Musa Nofiu Abiodun: Department of Quantity Surveying, Faculty of Environmental Design & Management Obafemi Awolowo University, Ile-Ife, Nigeria
Kadiri Dele Samuel: Department of Quantity Surveying, Faculty of Environmental Design & Management Obafemi Awolowo University, Ile-Ife, Nigeria
Ebunoluwa Esther Ilori: Department of Quantity Surveying, Faculty of Environmental Design & Management Obafemi Awolowo University, Ile-Ife, Nigeria
Organization, Technology and Management in Construction, 2022, vol. 14, issue 1, 2710-2730
Abstract:
This study examines the capability improvement measures of the public sector client for enhancing the implementation of building information modeling (BIM) in construction project delivery. The study adopted a quantitative descriptive analysis based on primary data obtained through a structured questionnaire. A total of 198 valid questionnaires obtained from construction professionals within public sector organizations in Lagos State, Nigeria, provided primary quantitative data for the assessment. Data collected were analyzed using descriptive and inferential statistics. The findings indicated the measures to enhance the capacity of the public sector for BIM implementation including the following: team-based structure and recruitment of adequate number of staff (with mean score [MS] = 3.66), government support and involvement (MS = 3.64), government policies, adoption of process open to innovation, and investment in equipment and technology (MS = 3.60) had been considerably entrenched. However, measures that resulted in improved efficiency were limited to the following: reward system for performance (MS = 3.81), government policies, and education and training of staff (MS = 3.74), government support and involvement (MS = 3.73), and clear job description (MS = 3.71). Most of the measures with high level of impact were not necessarily those that are frequently used. On this basis, the public sector needs to differ from the status quo by adopting improvement measures that are appropriate for enhancing its capabilities for BIM in project delivery. The findings indicate implications that could enable the public sector to adjust and make necessary policies in a bid to improve BIM implementation in project delivery.
Keywords: building information modeling; capability improvement; public sector; building projects; implementation (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.2478/otmcj-2022-0014 (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:14:y:2022:i:1:p:2710-2730:n:5
DOI: 10.2478/otmcj-2022-0014
Access Statistics for this article
Organization, Technology and Management in Construction is currently edited by Mladen Radujković
More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().