Contract price change during the construction phase: unforeseen market conditions

Suman Natasa () and Tominc Stanko
Additional contact information
Suman Natasa: University of Maribor, Faculty of Civil Engineering, Transportation Engineering and Architecture, Maribor, Slovenia
Tominc Stanko: Javno podjetje Nigrad, d. o. o., Maribor, Slovenia

Organization, Technology and Management in Construction, 2024, vol. 16, issue 1, 109-122

Abstract: The unstable economic conditions that have been in place in the Slovenian and international construction markets reveal the problem of a disproportionate increase in the prices of construction materials and energy products. Such increases will therefore result in higher costs of construction services, which would ultimately affect the total value of the construction project. These events in turn bring uncertainty to the construction project and would negatively impact the business of construction companies and investors. Legal and construction practices have so far developed various ways to regulate contract changes arising due to unforeseen market conditions. The present paper offers a contribution to the contract price change solution during the construction phase. The introduction first presents the measures and guidelines that deal with the differences in contract prices in Slovenia and some other countries. Then, various methods of calculating price differences that have emerged in current Slovenian practice are described. As a result, a proposal for a hybrid method of monthly price difference calculation is presented. The hybrid method represents a balanced solution resulting from the unforeseen increase in construction material prices on the market and is applicable to all construction projects. The three methods, i.e., a calculation method, a method based on the GZS-ZGIGM index, and a hybrid method, are applied to a real example of a public contract. The calculation of the price valorisation, represented as an index of the recognised price increases of contract works, is carried out. The results are compared, and further solutions are proposed.

Keywords: construction contract; construction market; contract price; price index (search for similar items in EconPapers)
Date: 2024
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://doi.org/10.2478/otmcj-2024-0009 (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:vrs:otamic:v:16:y:2024:i:1:p:109-122:n:1009

DOI: 10.2478/otmcj-2024-0009

Access Statistics for this article

Organization, Technology and Management in Construction is currently edited by Mladen Radujković

More articles in Organization, Technology and Management in Construction from Sciendo
Bibliographic data for series maintained by Peter Golla ().

 
Page updated 2025-03-20
Handle: RePEc:vrs:otamic:v:16:y:2024:i:1:p:109-122:n:1009